BAAQMD sample-and-test before scraping
For a single-family house or a building of two to four units, the district skips the full survey but still wants a lab test on acoustic ceiling texture before anyone removes or disturbs it. You can collect the scrapings yourself. Contractors with building-inspector training can also take a limited number of residential samples while preparing a bid, under state law. Keep the lab report, because a district inspector may ask to see it.
Sprayed texture crumbles under hand pressure, so a result above 1% asbestos makes it friable, regulated material that has to come off with wet, contained methods. Removing 100 square feet or more needs a renovation J# filed ten working days ahead, or 72 hours ahead for the added fee on buildings of four units or fewer. Coating intact texture with a sealant is an alternative if it will not be disturbed, but any later drilling, sanding or demolition puts removal back on the table.
New recessed lights and vents often mean attic work too, and that side of the job is under asbestos HVAC duct and insulation removal. Floors, siding and demolition prep are all part of what we remove.