Planning around summer heat and HVAC replacement
In Antioch's hot, dry summers, the attic and the AC are the two things nobody wants offline in July. Testing the duct tape, boots and flue at the quote stage, not when the new equipment is already on site, lets the abatement fit in ahead of the change-out instead of stopping it. Attic work in summer heat also limits how long anyone can stay inside containment, and that shapes the schedule.
Paperwork depends on how much comes out. Removing 100 linear feet or more of regulated pipe or duct insulation, or 100 square feet of other regulated material, needs a renovation J# filed ten working days ahead, or 72 hours ahead for the added fee on homes of up to four units. Contractors disturbing 100 square feet or more of asbestos-containing material must also be registered with Cal/OSHA and notify their district office before each job.
New register cut-outs and ceiling vents disturb the texture from below, which we cover under asbestos popcorn ceiling removal. We also do flooring, siding and demolition jobs.